{"id":2927,"date":"2016-02-19T09:36:02","date_gmt":"2016-02-19T09:36:02","guid":{"rendered":"http:\/\/www.dev.terre-armee.com\/?p=2927"},"modified":"2020-01-10T18:51:21","modified_gmt":"2020-01-10T18:51:21","slug":"russia-reinforced-earth-ramps-for-the-kaliningrad-stadium","status":"publish","type":"post","link":"https:\/\/www.reinforcedearth.co.uk\/russia-reinforced-earth-ramps-for-the-kaliningrad-stadium\/","title":{"rendered":"Russia – Reinforced Earth\u00ae ramps for the Kaliningrad stadium"},"content":{"rendered":"
Terre Arm\u00e9e France designed\u00a02 060 m\u00b2 of Reinforced Earth\u00ae access ramps<\/strong>\u00a0and supplied materials.<\/p>\n Terre Arm\u00e9e France also provided a technical assistance.<\/p>\n The first ramp was built in July 2015. The last one was completed in December 2015.<\/p>\n The use of TerraPlus\u00ae panels enables to achieve the structures on time as these panels are easy and fast to set.<\/p>\n<\/div>Localisation<\/h2>\n<\/div>